Jiangsu Qianyuanfeida electric equipment Co.,Ltd

江苏乾元飞达电气设备有限公司

Manufacturer from China
Active Member
6 Years
Home / Products / Dust Removal Equipment /

Original Metal Coal Bunker Dynamic And Static Adjustable Labyrinth Seal

Contact Now
Jiangsu Qianyuanfeida electric equipment Co.,Ltd
City:zhenjiang
Province/State:jiangsu
Country/Region:china
Contact Person:Qi Emily
Contact Now

Original Metal Coal Bunker Dynamic And Static Adjustable Labyrinth Seal

Ask Latest Price
Video Channel
Brand Name :FIDAK
Model Number :NIL
Certification :ISO 9001
Place of Origin :Jiangsu, China
MOQ :1 piece
Price :Negotiable
Payment Terms :T/T, Western Union,Paypal
Supply Ability :40 tons per day
Delivery Time :5~15 working days
Packaging Details :Steel frame case sealed by plywoods with each end capped
Name :The original coal bunker
Connection :flange and welding are acceptable
Speed :1r/min
weight :2t
Power :3kw
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

The original coal bunker Dynamic and static adjustable labyrinth seal

Product overview

The original coal bunker is an insignificant part in the thermal power plant, but it is also the most prone to problems

Very serious.

The enterprise is committed to solving this problem for the power plant and other enterprises, with four years of research, test, now successfully developed can completely solve the power plant

The national patent product of the enterprise for this bottleneck problem is the rotary shovel type blocking and clearing machine for the original coal bunker (patent no. : ZL201020262144.1).Installation of the equipment

The lower end of the warehouse body replaces the original warehouse body, which is composed of the spatula turning along the warehouse wall, the upper and lower sections of the warehouse and the external drive, which is changed by the relative motion of the spatula

The coal flow direction, always keep a loose gap between the coal and the warehouse wall, can completely break the coal knot arch formed by the balance, completely eliminate the attachment

The coal on the warehouse wall fundamentally solves the problem of coal plugging.At the same time, when the equipment is not running, there is no other equipment in addition to the shovel, not on the coal

Flow creates obstruction.At present, it is the only state-level new patented product that can completely solve and prevent coal plugging in China.

Working principle

Our company's original coal bunker rotary shovel type blocking machine is divided into three parts, the upper and lower parts are divided into static warehouse, the middle part is rotary shovel.its

The whole part of the warehouse is easy to block, so the rotary shovel type anti-block cleaning machine is the key part to solve the blockage of the whole original bunker.

The device is composed of reducer, electric control box and body, etc. Its operating principle is: the driving wheel mounted on the reducer drives the slave wheel to rotate and is mounted on the slave wheel

The spatula on the driving wheel runs in sync with the spatula, shoveling the blocked coal away from the bunker wall so that it loses the supporting force point attached to the wall, and thus in its own gravity

Under the circumstance of automatic fall, clear the blockage, keep the coal bunker smooth, fundamentally solve the original coal bunker coal blocking problem.

Product technical parameters

Model: khfd-1 speed: 1r/min

Power: 3KW weight: 2t

Installation position: the connection form of blocked bunker section: flange and welding are acceptable

External size: diameter is the size of the customer's existing coal bunker, and the height shall not exceed 2000mm according to the situation of on-site coal plugging

Equipment features and performance

1. Sealing characteristics

Adopt static and adjustable labyrinth seal, divided into upper and lower seal.Pulverized coal is a poor medium, so it is difficult to seal. The new material used in this equipment has a seal

Reliable, durable and adjustable.

2. Structural features

Rotating spatula circulates along the wall of the warehouse to make the coal attached to the wall detach from the wall, causing it to lose its stress point and fall off.The spatula is synchronized with the drive and adopted

Flange connection, easy installation.

3. Stable and reliable transmission

Adopt electric drive, the way that pair of wheel connects, drive and drive part are arranged outside warehouse wall, vertical arrangement, won't hinder the flow of coal inside warehouse at all, drive

Stable and reliable.

4. High degree of automation

PLC control, can achieve local and remote monitoring, according to user needs to set manual, timing, automatic and other operating control methods, another automatic

Test start mode, when the coal is broken, the equipment automatically open, to ensure the normal flow of coal.Motor adopts German SEW with frequency conversion protection, more stable performance.PLC

Germany Siemens is adopted to ensure the reliability of operation.

5. Long service life of the equipment

The main parts of the spatulator adopt a whole forging forming, 40Cr, with high wear resistance and strength, can effectively prevent equipment corrosion, fracture, wear, use

Life is long.The warehouse walls can be made of different materials according to the user's requirements.

6. Small maintenance and convenient maintenance

The driving part is designed on the outside of the warehouse body for easy maintenance.In order to prevent the harsh environment in the field, the driving part is equipped with a protective cover to protect the driving equipment

Normal operation.

Installation and debugging of rotary shovel type blocking and clearing machine for original coal bunker

1. Use the crane to lift the whole equipment to the operating platform of the coal feeder, and then transfer it to the bottom of the coal bunker to be transformed.

2. Before installation, the external dimensions of the parts to be modified should be measured carefully according to the drawings, and checked with the relevant interfaces of the equipment, so as to determine whether the modification plan should be changed.

3. Draw the upper section to cut the circumference line on the warehouse body to be modified according to the figure, and the lower section to cut the circumference line along the upper part of gate valve.Check the air cannon and other lines for dryness

Those involved should be removed.

4. Weld the two opposite flanges on the original coal bunker.

5. Hoist the original coal bunker with zipper hoist to the installation position, if the position is not suitable, it can be realized by adjusting the expansion section of the lower part.lifting

According to the actual situation, additional lifting lugs can be added or the position of lifting lugs can be changed.Note: prevent lifting deformation of equipment.First wear the 6 ~ 8 retaining bolts and then pass through the reducer

Impeller manual rotation shovel knife, see whether the rotation is flexible, there is no interference, whether the seal is tight, if there is a problem to solve on site.After confirming no problem, tighten all bolts.

6. Electric control part: professional electricians shall connect the motor, control cabinet and power supply according to the circuit diagram.

7. When all equipment is installed, first select "manual" and "remote/local" on the control panel as "manual" and "remote/local" as "local".

Then the device and its control cabinet shall be charged, the "emergency stop" button shall be reset, and the power indicator of the control panel shall be observed.Manually press the "start" button to observe the slave wheel

No "clockwise" direction rotation, whether the supporting part rotation is flexible, there is no abnormal vibration friction sound.Manual "emergency stop" button is out of service immediately if any abnormality is found.If the shipment

Line is normal, keep running for 2 hours, check the sealing condition, current size, temperature rise of reducer, etc.

8. When no load is on, select the "manual/automatic" selector switch on the control panel to select "automatic", "remote/local" selector switch to select "local" to effectively simulate the coal break signal.

Observe that the device starts normally.The signal of simulated coal failure is invalid, and the observation device will stop automatically for 180 seconds.

9. After loading the original bunker, select the "manual"/" automatic "selection switch on the control panel and select" local "and press" emergency stop"

Reset the button and observe the power indicator on the control panel.Manually press the "start" button to observe whether the slave wheel is rotating normally and whether the supporting part is rotating flexibly

Unusual vibration friction sound.Manual "emergency stop" button is out of service immediately if any abnormality is found.If the operation is normal, keep the operation for 2 hours, check the sealing condition, current size,

Reducer temperature rise, etc.

Inquiry Cart 0